The Energy Saving Renovation Project of taizhou of the Wangping Power

Through its repeated survey and demonstration efforts in many aspects, the Wangping Power Plant of Datong Coal Mine Group finally accepted Zhiguang's solution for the system energy saving renovation, according to which hydraulic couplers were replaced with a special HV frequency converter and a speed-increasing gearbox. The energy saving renovation of feed pump systems for Unit #1 was successfully implemented on October 9, 2014. According to the data on the operation of Unit #1 for one month, it was indicated that the feed pump units with the frequency converter operated well, with fast response, and that the power saving rate was beyond expectation.
           

The Energy Saving Renovation Project of taizhou of the Wangping Power

        

 

The Energy Saving Renovation Project of taizhou of the Wangping Power

         

 

The Energy Saving Renovation Project of taizhou of the Wangping Power

 

  

With respect to the solution for energy saving renovation projects, Zhiguang Electric has suggested that any large-sized thermal power generation unit should be fully equipped with boilers, electric feed pumps and frequency converters. Since October 2012, such solution has been successfully applied in large-sized thermal power generation units in Ningxia, Inner Mongolia, Shanxi and Zhejiang in succession, witnessing good operation and energy saving effects. Zhiguang Electric has been highly appreciated by clients.

 

  • Summary
  • case
  • download
Copyright ©2005 - 2017 Guangzhou Zhiguang Electric Ltd.