Business Products
Products Industry

Waste Heat-based Power Generation Unit 2

On December 18, 2013, the waste heat-based power generation unit for Cement Clinker Production Line #2 of Ningxia YinghaiTianxiang Building Material Co., Ltd., which was undertaken by Guangzhou Zhiguang Energy-saving Co., Ltd., was successfully started and connected to the grid for the first time. It met the design requirements as expected. After completion of the 72h operation testing, it was formally put into operation.
This project includes the construction and operation of two heat recovery steam generators (HRSG), a condensing steam turbine generator unit, a cooling tower, a desalination station, an access system, an ash conveying system and related supporting facilities. The completion and operation of this project have brought much experience to Zhiguang regarding the construction and management of waste heat-based power generation projects. It is anticipated that, after the project reaches its target output, at least 12,000 t standard coal can be saved per year. The project conforms to the national policies for energy saving and emission reduction with good economic and social benefits.
  

Waste Heat-based Power Generation Unit 2

 

 

  • Summary
  • case
  • download
Copyright ©2005 - 2017 Guangzhou Zhiguang Electric Ltd.