Business Products
Products Industry

Heat Utilization and Heating Network Project

Phase I of the Steam Exhaust-originated Waste Heat Utilization and Heating Network Project of a Coal-fired Power Group in Shanxi

  

On August 3, 2015, Guangzhou Zhiguang Energy-saving Co., Ltd. and Shanxi Guojin Coal-fired Power Company Limited concluded the Energy Management Contract (EMC) for Phase I Heating Network Project of Shanxi Guojin Coal-fired Power Company Limited with respect to high back pressure reconstruction works of air cooling units for the recovery of waste heat from steam exhaust and the heating network works in the first station of heat source.

Both parties intended to recover waste heat from steam exhaust by utilizing the high back pressure technology for the urban heating of Taiyuan in winter. This project involved the design, renovation and construction of steam extraction and heating pipes for two 300 MW turbines. specifically including: renovation of steam extraction and high back pressure systems; design of first station for the heating network, circulating water, water pumping and other related systems; purchase and supply of equipment and materials; installation of the thermodynamic and electric heat control systems; civil works, scaffolding erection, welding, security and fire protection, debugging and operation, inspection and acceptance, equipment repair and maintenance and the like.
  

Heat Utilization and Heating Network Project

 

  • Summary
  • case
  • download
Copyright ©2005 - 2017 Guangzhou Zhiguang Electric Ltd.
犀牛云提供云计算服务