Multi-mode Grounding Renovation Project of Zhongshan

Date: 2016-05-24
Click: 37

The 110 kV Baishi Substation of Zhongshan Power Supply Bureau has three main transformers and four 10 kV busbar sections, among which 2AM and 2BM busbar sections operate in parallel. Currently, its eighteen 10 kV outgoing lines (and 17 lines for standby) consist of overhead lines and cables.Before renovation, there were three arc suppression coils, among which two were of the multi-tap type and one was of the high-impedance type. They were supplied by different manufacturers and had inadequate capacity. As a result, the line selection accuracy for earth faults was less than 60%. In the renovation of the Baishi Substation, the application of three intelligent multi-mode neutral grounding systems offers a full automatic and whole-process solution for its 10 kV distribution network.
 
1. Commissioning Test & Verification of Intelligent Multi-mode Neutral Grounding Systems

On November 2, 2012, such systems before operation were given two metallic grounding tests at the 110 kV Baishi Substation. An artificial grounded single-phase short circuit was made by closing switches in the substation to verify the action reliability of such grounding systems.The manual remote control requiring more time could not result in remote-controlled switch closing and opening within 10s. For both grounding tests, low resistors were automatically used into the systems after 10s. Protective devices achieved the switch tripping in grounded lines. After faults were isolated, the normal operation of those systems was recovered. The systems ran correctly, with records shown below.

 

Multi-mode Grounding Renovation Project of Zhongshan
1st artificial grounded single-phase short circuit 

 

Multi-mode Grounding Renovation Project of Zhongshan               

2nd artificial grounded single-phase short circuit

   

The data on this commissioning test and verification are shown as follows. In both grounding tests, the arc suppression coils are going into the compensation state and fulfilling accurate compensation as per given parameters the moment that earth faults occur. After compensation, the residual currents are less than 5 A, without any arc grounding overvoltage.

     

Multi-mode Grounding Renovation Project of Zhongshan

System Actions of the 10 kV Lines in the Baishi Substation during Two Artificial Grounded Single-phase Short Circuits 
During grounding for more than 10s (set point), low resistors from the complete unit are used, so that strong current signals generated enable the line protective devices to accurately trip those faulty lines. Consequently, faults are successfully isolated and the systems operate normally again.

            

 

Analysis on the Operation of  Intelligent Multi-mode Neutral Grounding Systems

Since its operation on November 3, 2012 till December 18, 2015, the 110 kV Baishi Substation has had totally 159 single-phase groundings on its 10 kV lines, among which 148 were transient earth faults less than 10s, amounting to 93%.There were 11 permanent earth faults, in which the low resistors were used for Intelligent Multi-mode Neutral Grounding System #2 in nine cases and for System #3 in two cases. This was consistent with protective actions of the zero-sequence current on its lines.

For all earth faults, the arc suppression coils in such intelligent multi-mode neutral grounding systems have made fast and accurate compensation. For those faults with grounding more than 10s, the correct application of low resistors and protective actions of the zero-sequence current lead to the accurate protection from faulty lines and the fast recovery of normal system operation. These 11 permanent earth faults involve similar metallic grounding (voltage = 4802 V) and high resistance grounding (voltage = 1351 V). After the application of low resistors, the zero-sequence current can act correctly and protect from faulty lines.

 

 

 

Related news
  • click: 99
    2016 - 05 - 23
    The 110 kV Dalong Substation in Dongguan has three main transformers and four busbar sections. Currently, the sixteen 10 kV outgoing lines (total length about 100 km) consist of overhead lines and cables. Three KD-XH01-315 / Model 10.5 quick arc suppression systems (including two smart detectors for the earth fault of Type DDS distribution network) are installed in this substation. In this way, the integrated earth fault solution is available for the 10 kV distribution network.    It had operated for more than three years from October 2002 to the beginning of 2006. In the first year, only line selection rather than automatic trip was tentatively conducted as planned. The automatic trip has been enabled since January 7, 2004, with 10s as provisional trip time.   ...
  • click: 35
    2016 - 05 - 23
    Total Buck Transformer Substation 1# of Fujian Refining & Chemical Co., Ltd. is a 110 kV substation consisting of two 110 kV main transformers and two 6 kV busbar sections. It has secondary substations respectively for treated water, polypropylene, coking, hydrogenation, constant voltage, catalysis and circulating water. The 6 kV grid system is a resonance grounding system with the neutral point earthed via an arc suppression coil. The earth fault line selection devices for the microcomputer low current system are used for the single-phase grounding protection of each outgoing line circuit. Since their operation in 1997, the original air gap inductance regulation air-suppression system and its line selection devices have shown many problems, mainly including:   The grid capac...
  • click: 27
    2016 - 05 - 23
    Compensation capacity: -8 MVar to +8 MVarSystem voltage: 10 kVProject feature: an outdoor cabinet-type unit capable of being interconnected with the regional automatic voltage control (AVC) systemSystem composition: 8 MVar SVGCompensation scheme:   In normal cases, the system adopts the power factor of the 10 kV busbar as control target. In case of system failure, it will get into the overload forced compensation state for accelerating the recovery of network voltage.   A top layer controller is available for access to the substation monitoring system and the regional AVC system.
  • click: 40
    2016 - 05 - 23
  • click: 44
    2016 - 05 - 24
    Scheduling Data Interconnected System of Shanghai Electric Power Co., Ltd.Scheduling Data Interconnected System of Hubei Electric Power CompanyProvincial Real-time Scheduling Data Interconnected System of Hunan Electric Power CorporationData Interconnected System for the Concentrated Control Substation of Shanghai Electric Power Co., Ltd.Data Interconnected System of Hangzhou Municipal Electric Power BureauProduction Information Integration System of Huanggang Electric Power Company in Hubei ProvinceIntegrated Scheduling Data Platform of Shanghai Electric Power Co., Ltd.Integrated Scheduling Data Platform of the Lancangjiang Centralized Control CenterIntegrated Scheduling Data Platform of Hunan Electric Power CorporationIntegrated Scheduling Data Platform of Chongqing Electric Power Compan...
  • click: 28
    2016 - 05 - 24
    Online Monitoring System for HV Equipment State at the Booster Station of the Fengcheng Power Plant Intelligentized Reconstruction Project of the Fanchang Substation of Anhui Electric Power Company Intelligent Substation State Monitoring System for the Qiantang Substation in Hangzhou Intelligent Substation State Monitoring System for the Shanghai Mengzi Substation Integrated Monitoring System for the Xuhang Substation of East China Grid Company Limited Intelligent Substation State Monitoring System for the Data Interface Development of Guizhou Power Grid Co., Ltd. Intelligent Substation State Monitoring System of Gansu Electric Power Company Intelligent Substation State Monitoring System for Guizhou Power Grid Company for Online Substation Data Access into Level II Platform Intelli...
Copyright ©2005 - 2017 Guangzhou Zhiguang Electric Ltd.
犀牛云提供企业云服务